Skip to content
Solution 02

Ground-Mount Solar Parks

Ground-mount projects on unproductive land, from feasibility study to grid connection.

Aerial view of a ground-mount solar park

Ground-mount solar parks on unproductive or unused land: from feasibility study through design, installation, and grid connection.

How it works

We assess the land, grid capacity, and permitting path, then design a ground-mount system to match. Our own crews handle installation and commissioning; the system stays our responsibility after handover through a scheduled maintenance plan.

What’s included

  • Feasibility study and site assessment
  • System design and sizing
  • Installation and commissioning to ANRE grid-connection requirements
  • Ongoing maintenance and monitoring after handover

See also Rooftop Solar, Battery Storage (BESS), and EV Charging Infrastructure.

Equipment we use for this system

Panel manufacturers

  • Unicasolar
    Monocrystalline
  • Astroenergy
    N-Type TOPCon
  • Aiko
    N-Type ABC technology, 24%+ efficiency

Inverters

  • Huawei
    Industrial, 98.6% efficiency
  • Solis
    Commercial

Infrastructure

  • ZPUE
    Prefabricated transformer substations
  • Tesla Power Systems
    Romanian-manufactured MT/LV equipment, factory in Buzău
See all our technology partners

Built to still be earning its keep in year 30.

Real coefficients from the equipment we install and maintain, not marketing averages.

~1,200
kWh/kWp/yr average yield
98.6%
Peak inverter efficiency
6,000+
Battery charge cycles
30-year
Panel performance warranty
Output vs. Year 0
85%90%95%100%051015202530

Even after 30 years, a well-chosen system still produces nearly 89% of its original output.